Week 30 of 34

Week of July 13 — July 17, 2026

5 days on site. 75 photos. Appliances, Cabinets, Countertops, DFH, Drywall, Electric, Flooring, Landscape, Paint, Plumbing, Site Concrete and Drainage, Stucco.

July 13, 2026July 17, 20265 days75 photos
AppliancesCabinetsCountertopsDFHDrywallElectricFlooringLandscapePaintPlumbingSite Concrete and DrainageStucco

Monday, July 13, 2026

Partially cloudy, 78°F

Costco and Lowe's on site to deliver washer/dryers and appliances for B and C. Washers and dryers put in front unit of existing duplex until electrical loads get sorted. Microwaves and Dishwashers installed at B1, B2, C1, C2. Refers dropped in all four units but not installed. Ranges only dropped off in Building C.

JBG continuing to work on fences and gates. Striping forms from Saturday's pour.

ZSP digging trench and connecting new units to water main.

AC Electric completing more pick up items.


Manpower:

SUBCONTRACTORWORKERSHOURS WORKEDTOTAL HOURS
JBG2816
AC Electric0.584
ZSP188

Inspection: N/A


Delay: Pending electric coordination.

IMG_4184.jpeg

IMG_4191.jpeg

IMG_4177.jpeg

IMG_4178.jpeg

IMG_4175.jpeg

IMG_4176.jpeg

IMG_4173.jpeg

IMG_4174.jpeg

IMG_4169.jpeg

IMG_4172.jpeg

IMG_4162.jpeg

IMG_4166.jpeg

IMG_4160.jpeg

IMG_4161.jpeg

IMG_4157.jpeg

IMG_4156.jpeg

IMG_4158.jpeg


Tuesday, July 14, 2026

Clear, 72°F

ZSP installing water heaters and continuing trim out.

Taylor Trim installing remaining door hardware, threshold, weatherproofing, building and unit numbers.

Traditions working on punch list and repairing trade damage.

Marjan cleaning countertops and caulking.

Blue Tape walk with Paige around 11:30 AM.

Coastal fixed LVP edge at C2 entrance and installed T-Mold at bathroom tile transition.


Manpower:

SUBCONTRACTORWORKERSHOURS WORKEDTOTAL HOURS
ZSP188
Traditions188
Taylor Trim144
Marjan Stone224

Inspection: N/A


Delay: Pending closure on electrical.

IMG_4222.jpeg

IMG_4223.jpeg

IMG_4215.jpeg

IMG_4241.jpeg

IMG_4240.jpeg

IMG_4244.jpeg

IMG_4242.jpeg

IMG_4263.jpeg

IMG_4262.jpeg

IMG_4265.jpeg

IMG_4264.jpeg


Wednesday, July 15, 2026

Clear, 80°F

Taylor Trim installing remaining baseboards, shoe molding at Building C peninsulas, Unit Numbers, and door hardware.

AC Electric finishing punchlist items.

ZSP installing water heaters and enclosures at Building B.

Traditions sanding and finishing patching at all units and front house. Ken Huffman on site at 11:00 AM to perform QC.

Primera doing final walk through, patching, and adjustments at cabinets.

Golden Roots working on Stabalized DG at back area. DG, drywells, and 1 yard of gravel delivered to site.

Marq removing all extra sand and stucco debris from site.


Manpower:

SUBCONTRACTORWORKERSHOURS WORKEDTOTAL HOURS
Taylor Trim1.25810
AC Electric144
Traditions2816
ZSP188
Marq122
Golden Roots3824
Primera188

Inspection: N/A


Delay: Electrical

IMG_4278.jpeg

IMG_4280.jpeg

IMG_4279.jpeg

IMG_4285.jpeg

IMG_4282.jpeg

IMG_4288.jpeg

IMG_4287.jpeg

IMG_4292.jpeg

IMG_4291.jpeg

IMG_4294.jpeg

IMG_4293.jpeg

IMG_4296.jpeg

IMG_4295.jpeg

IMG_4299.jpeg

IMG_4297.jpeg

IMG_4300.jpeg

IMG_4301.jpeg


Thursday, July 16, 2026

Partially cloudy, 69°F

JBG installing range and microwave in garage unit. Hand rails installed.

ZSP installing remaining toilets and building C water heaters. ZSP will need to cut drywall at Building B Unit 1 to move water heater drain.

AC electric installing remaining under cabinet lights and disconnects. Meters labeled to prepare for inspection.

Golden Roots digging at front of property to install drywells.

Painters Unlimited doing final paint at Building C.


Manpower:

SUBCONTRACTORWORKERSHOURS WORKEDTOTAL HOURS
JBG3412
AC Electric2816
ZSP2816
Painters Unlimited3824
Golden Roots2816

Inspection: N/A


Delay: Letter accepted by Dan. Meter release scheduled for Monday.

IMG_4350.jpeg

IMG_4349.jpeg

IMG_4358.jpeg

IMG_4355.jpeg

IMG_4360.jpeg

IMG_4359.jpeg

IMG_4363.jpeg

IMG_4361.jpeg

IMG_4362.jpeg

IMG_4364.jpeg

IMG_4369.jpeg

IMG_4368.jpeg

IMG_4370.jpeg

IMG_4391.jpeg

IMG_4386.jpeg

IMG_4390.jpeg

IMG_4389.jpeg

IMG_4392.jpeg

IMG_4393.jpeg


Friday, July 17, 2026

Overcast, 77°F

ZSP continuing to install water heaters, removing garbage disposals, and installing remaining toilets.

AC Electric installing house panel and preparing to pull wire.

Painters Unlimited continuing final coat.


Manpower:

SUBCONTRACTORWORKERSHOURS WORKEDTOTAL HOURS
ZSP188
Painters Unlimited3824
AC Electric144

Inspection: N/A


IMG_4420.jpeg

IMG_4421.jpeg

IMG_4441.jpeg

IMG_4414.jpeg

IMG_4419.jpeg

IMG_4411.jpeg

IMG_4412.jpeg

IMG_4409.jpeg

IMG_4410.jpeg

IMG_4407.jpeg

IMG_4408.jpeg